Friday, January 04, 2008

Master Bathroom Remodel









At the beginning of December my husband got a while hair to start remodeling our master bathroom. It REALLY needed it don't get me wrong. The tile was coming off and there was TONS of mildew and mold and bugs, and yuck under the tile so he decided that it needed to be done NOW. So my Super Awesome Talented Hardworking Husband and my Master Tile Craftsman Dad spend their Christmas break tiling my shower and bathtub. I thought that I would share with you the end result. Can I just say that I LOVE IT! I can't stop looking at it. Thank you, thank you, thank you! Now we are not done though. The floor has been torn out and the tile will be laid sometime. I think that boys need a bit of a break!
Oh and isn't that the COOLEST shower head ever?

10 comments:

Aubrey said...

Oh my goodness, that is georgous. Tell Trevor great job. He has become quite the tile man.

Unknown said...

Holy bananas! Gorgeous, the shower, the tub, AND the photos. Love.

Unknown said...

that is GORGEOUS! I LOVE it! I am LOVING that shower head. How cool is that? It only took him a month to do that? that is amazing! way to go Trevor!!!

FitGeGe said...

LOVE!!!!!!!!!! Congratulations!!

suzspeaks said...

I don't know how I missed this post...but your bathroom is beautiful!!!! Amazing!!! I love it...and the shower head...wow!

Becky said...

Oh my gosh! I want your bathroom!!! That looks like something out of House Beautiful. Can I hire your husband?

Amber said...

Wow!!!
That is absolutely a fabulous bathroom. I would be tempted to spend all day in the shower or bath.

Cassie said...

THAT SHOWER HEAD!!! It looks amazing. Love the bathroom!

Robin and Stephenie said...

I am coming to your house for a bath and a shower! when we get ready to tile we know who we are calling GOOD JOB!

Becky and Bryce said...

Wow that is incredible, looks like you're at an incredibly expensive spa or something. I can't believe it. You have made your home so beautiful. Good Job Weeks!!!